Technical advice
Engineering expertise on call for the decisions your team faces, given in writing so it can be acted on and audited later.
Engineering consultancy
Handasa Tech reviews designs, specifications and maintenance records, then gives owners and operators a practical framework for running their buildings: what to record, how to prioritise, and what must be verified before a job is closed.
Services
We work alongside your engineering, operations and quality teams. Our role is advisory: we set out the technical position and the controls, and your authorised people carry out and accept the work.
Engineering expertise on call for the decisions your team faces, given in writing so it can be acted on and audited later.
Review of designs, drawings, plans and specifications before they are built or issued, with clear comments and recommended changes.
A defined work-order lifecycle with status definitions, a priority matrix and the minimum evidence required at each stage.
An asset hierarchy, criticality ratings and a risk-based task library, so that what breaks today changes what is inspected tomorrow.
Quality gates that stop a job being closed until the function is tested, the finishes are reinstated and the evidence is on record.
Technical meetings, remote or in person, and consultation through delivery for the project teams who need an engineer in the room.
Method
A plumbing leak is not resolved when the water stops if the ceiling, the paint and the root cause are still outstanding. We test each record against a complete lifecycle, and each stage has evidence it must leave behind.
Log the defect and make it safe. Unique ID, exact location, asset, first photograph.
Confirm discipline, consequence and urgency. Record the reason for the priority.
Method, competency, spares, permits and isolation, with a target completion.
Carry out the authorised repair. Record parts, readings and any deviation.
Test the function and inspect the workmanship, checked by someone independent.
Close only when linked tasks pass, with final cause, remedy and acceptance.
Spot repeat failures and update the preventive tasks, frequencies and spares.
Controls
We leave your team with gates that are checked before a work order moves on, and a short set of measures that management can read each month.
One question at each gate, answered with evidence.
Defined once, calculated the same way at every site.
Engagement
We start from the records and documents you already have. The output is a written engineering deliverable with a prioritised plan, sized so it can be standardised across a multi-site portfolio.
Days 0 to 30
Review forms, registers and close-out evidence. Agree status definitions, the priority matrix and mandatory fields. Clean the active backlog.
Days 31 to 60
Issue the revised work-order form and closure checklist. Brief supervisors and discipline leads. Link open and closed jobs to the asset hierarchy.
Days 61 to 90
Review repeat failures and update preventive tasks. Launch a monthly management review of trends, backlog, service levels and quality findings.
Contact
Send a short description of the site or portfolio, the documents you have, and the decision you need to make. We will reply with how we can help.